Cantilever Forming Traveller

3(1)

Cantilever Forming Traveller

Product Description:

The form traveller system is acclaimed for enhancing the cost-effectiveness of bridge projects worldwide. The system is lightweight, versatile, easy to assemble and operate, rolling forward on rails, the system can be reset quickly and easily.

The form traveller is used for free cantilever construction of post-tensioned box girder - and cable-stayed concrete bridges. Engineering to international standards, the system provides an exceptionally rigid formwork, with a maximum deflection of less than 25mm at full loading.

The Standard formtraveller is designed for a maximum segment length of 5 m and load capacities (concrete and formwork) varying from 250t to 400t. The steel weight depends on the crosssection of the bridge in question, but will normally vary from about 25t to 65t correspondingly. The Standard formtraveller may be adapted to suite almost any cross-section, and is easily adjustable during operation to variations in segment length (up to 5 m), section height, web thickness, and deck width.

Inquire Now

product analysis

Basic Construction

The Form traveller designed and production by our company it consists of the Main Truss System, Loading Board System,Running &Anchoring System,Lift system of the Cantilever,Formwork and Support System.


Product DescriptionForming TravellerOriginChinaTrademarkTY-FORMWORK
CertificateISO9001Production Capacity4000 Tons /MonthMain Spans64m~200m
Transport PackageExport Standard PackingDesign CalculationMIDASSructural styleModular Bolting /Welding
Method of assemblyOn-siteTechnical guidanceYESDrawing suppliedAssembly drawings


Product Delivery

Packaging:
1. Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading. 
2. Different packages are used for different products: 
---Bundles: Timber beam, steel props, tie rod, etc. 
---Pallet: Small parts will be put in bags and then on pallets. 
---Wooden cases: It is available on customer's request. 
---Bulk: Some irregular goods will be loaded in bulk in container. 


Delivery: 
1. Production: For full container, normally we need 20-30 days after receive customer's down payment. 
2. Transportation: It depends on the destination charge port. 
3. Negotiation is needed for special requirements.

About us

Shandong Tongyao Heavy Industry Co.,Ltd(STHI) is an Professional High-tech Enterprise, Which is dedicated to the Research & Development, Manufacturing, Selling, Leasing and Consulting of Bridge Formworks and Road & Bridge and Tunnel Construction Equipment. The company was established in 2015, locating in Binzhou City of Shandong Province China, and now is the Bench-marking  enterprise of Road and Bridge Construction Equipment System.

Since its inception, the company has scrupulously abided by the values of “creating value for customers, opportunity for employees, and benefit for the society” and concentrated on providing our global clients with diversified products application solutions and creating the most valuable TongYao international brand. Till now, we have more than 40 kinds of products, including bridge steel structure, launching girder, form traveler, segment girder and hydraulic climbing formwork etc., which being widely used in bridge, municipal projects, water conservancy, tunnel, nuclear power and some other large projects. With the help of professional logistic system and after-sale service team, we strive to achieve the total logistic radiation of the key area throughout the world, and make sure the rapid integration and scientific allocation of the resources.


Certifcations

Foreign trade certificate

Foreign trade certificate

Steel structure Grade II Qualification

Steel structure Grade II Qualification

Business License

Business License

_16982921976279

_16982921976279

_16982922138725

_16982922138725

_16982921808449

_16982921808449

Customer Photos

6771697683251_.pic

6771697683251_.pic

6781697683252_.pic

6781697683252_.pic

6681697683167_.pic

6681697683167_.pic

6671697683166_.pic

6671697683166_.pic

6691697683168_.pic

6691697683168_.pic

6711697683171_.pic

6711697683171_.pic

6721697683172_.pic

6721697683172_.pic

6751697683233_.pic

6751697683233_.pic

6761697683249_.pic

6761697683249_.pic

891652857834_.pic

891652857834_.pic

7111698287902_.pic

7111698287902_.pic

7121698287903_.pic

7121698287903_.pic

7101698287902_.pic

7101698287902_.pic

P1090727

P1090727

P1090731

P1090731

7091698287901_.pic

7091698287901_.pic

IMG_20161125_113302

IMG_20161125_113302

P1090727

P1090727

P1090731

P1090731

P1160782

P1160782

P1160779

P1160779

P1160827

P1160827

P1160834

P1160834

P4160544

P4160544

-2

-2

-2

-2

-2

-2

Faq

  • 01. Where is your factory?

    Our factory is located in Binzhou city, Shandong province, where is 350km far from Beijing, 200km far from Tianjin port. 

  • 02. How fast can my order be delivered?

    Ex works delivery is usually 30 days after receipt of your contract and advance payment.

  • 03. What's the material of your products?

    Steel GB Q235B or Q345B.

  • 04. What's your payment term?

    1) 50% TT in advance, balance before shipment.

    2) 50% TT in advance, 50% by Irrevocable l/C at sight.

inquire now

Product Evaluation

WRITE A REVIEW

rating: